旋喷桩加固对控制盾构下穿铁路变形数值分析3
王庆国1,2,孙玉永3
(1.上海市轨道交通申松线发展有限公司,上海 200092;2.同济大学土木工程学院,上海 200092;
3.同济大学交通运输工程学院,上海 201804)
摘 要:针对上海市轨道交通9号线一期工程R413区间上、下行线和出入段盾构隧道下穿南新铁路环线工程,通过建立三维有限元模型,分析了旋喷桩加固对于控制既有铁路变形的效果。通过计算分析可知,旋喷桩的存在能够有效控制盾构隧道施工引起的既有铁路纵向和横向沉降及不均匀沉降,从而保证既有铁路安全运营不受影响。
关键词:旋喷桩;加固;盾构隧道;三维有限元
中图分类号:T U455.43;T B115 文献标识码:A文章编号:167320836(2008)0520860205
Nu m er i ca l Ana lysis of Settle m en t for a Sh i eld Tunnel Under2pa ssi n g
the Ex isti n g Ra ilway w ith Rot ary Jet P ile
WANG Q ing2guo1,2,S UN Yu2yong3
(1.Shanghai Rail T raffic Shensong L ine D evelop m ent Co.L td.,Shanghai200092,China;
2.School of C ivil Engineering,Tongji U niversity,Shanghai200092,China;
3.School of Transportation Engineering,Tongji U niversity,Shanghai201804,China)
Abstract:Based on the shield tunneling of the first-stage p r oject of R413on line9of Shanghai urban rail tran2 sit under2passing the Nanxin rail w ay,a3D-FE M model is built.The effect of r otary jet p ile reducing the influence of rail w ay is analyzed thr ough the model.Analysis result shows that the existing r otary jet p ile can contr ol the def or m2 ati on and uneven defor mati on of transverse and l ongitudinal of the existing rail w ay effectively.Theref ore,the existing rail w ay can keep nor mal operati ons.
Keywords:r otary jet p ile;reinf orce ment;shield tunnel;3D-FE M
1 引言
盾构法修建地铁隧道具有对周围环境影响小、施工安全快速、适应软弱地质条件等优点,已成为软土地区城市地铁隧道施工的最常用方法。盾构法施工时,往往会对周围地层产生扰动以及建筑空隙填充不充分,都会引起周围地层移动[1],地层移动一方面在地表引起不均匀沉降,另一方面直接引起地下近接结构物的变位。目前,围绕盾构隧道施工引起土体变形已做了不少的研究工作[2~4],但由于地质条件的复杂多变及施工参数的变化,使得研究成果具有一定的局限性。
随着我国城市化进程的不断加快,受地上地下既有建筑物或地质条件的以及地下空间综合开发利用的需要,隧道间或隧道与其他结构物之间的距离越来越近,盾构隧道近距离下穿既有铁路就是一个很典型的案例。隧道下穿铁路引起的铁路线路变形,加剧了轨道的不平顺,不仅加大了轮轨间的冲击力,加速轨道架构和基床的破坏,对铁路运营安全也产生严重影响[5,6]。为了保证既有铁
3收稿日期:2008203210(修改稿)
作者简介:王庆国(19732),男,上海人,博士研究生,主要从事轨道交通方面的设计和科研工作。E2mail:sunyuyong2 @126.com
路的安全运营,目前采取的措施主要有两个,一方面对地基土进行加固处理,包括注浆加固、旋喷桩
加固[7,8]
等,另一方面是严格控制盾构推进时的施
工参数[9,10]
,减少施工对地层的扰动。本文以上海市轨道交通9号线一期工程R413标为背景,采用数值模拟的方法就盾构隧道近距离穿越既有铁路时,旋喷桩加固对控制地表变形的作用进行分析,可为将来类似工程的设计、施工提供参考。
2 工程概况
上海市轨道交通9号线一期工程R413标段
盾构隧道(
九亭站-七宝站)位于上海市闵行区沪
松公路沿线,线路呈西东走向。区间上、下行线和东出入段线盾构隧道在区间东西岔道井之间DK20+6(=L2DK0+220)处下穿越南新铁路环线,铁路为双线铁路(路基宽约13m ),位于隧道上方,与
隧道基本正交(相交角约88°)。本段线路为上、下
行线和东出入场线三线并行地段(均为直线段),上下行线线间距为20m ,而东出入断线位于上、下行线中间,三线间隧道净距仅为3.8m ,上、下行线隧道埋深约9.1m ,出入场线隧道埋深为7.8m 。具体关系见图1所示。
图1 盾构隧道与南新铁路相互关系图
Fig .1 The sketch of relati on bet w een the shield tunnel and Nan -xin rail w ay
根据九亭站~七宝站区间详细勘察工程地质报告,盾构隧道穿越的主要地层为灰色粉质粘土和灰色粘土,具有软塑、高含水量、大孔隙比、高敏感度、受扰动沉降大、稳定时间长等特点,对控制施工引起的变形不利。主要土层的物理力学指标参见表1。
根据已有的工程经验,隧道下穿越南新铁路
施工必然会引起线路下沉,且经过5次大提速后,沪杭线的列车行驶速度及行车密度均大大提高,不仅提高了沪杭铁路的保护等级,较大的列车动荷载也会增加盾构施工的难度。综合考虑以上因素,并结合既有工程经验,拟对旋喷桩加固对控制既有铁路变形进行研究,地基加固平面图如图2所示。
表1 土层的物理力学指标
Table 1 The desi gn param eter of so il l ayers
层号地层名称
含水量
W (%)重度γ(K N /m 3)
孔隙比
e 粘聚力
C (kPa )内摩擦角φ(°)
压缩模量
(M Pa )静止侧压力系数K 0
②1褐黄色粉质粘土
29.918.90.842819.05.450.53②3灰色粉砂28.718.80.81437.510.250.37③1灰色粉质粘土41.017.61.151516.03.110.52⑤1a 灰色粘土
39.5
17.7
1.12
17
11.5
3.14
0.56
3 数值模拟
3.1 计算模型的建立
隧道推进对既有铁路的影响是一个三维问题,且该线与既有铁路的夹角为88°,因此在模型建立中取为正交以简化计算。考虑到有限元分析中的边界效应,整体尺寸确定为:沿盾构隧道推进方向
(纵向)尺寸为28m ,沿铁路方向为100m ,深度尺寸
为36m 。模型的边界条件如下:前后两面边界结点施加X 方向的水平约束;左右边界结点施加Y 方面的水平约束;底面结点,施加Z 方向的竖向约束。模型中,土体、管片以及既有铁路均采用八结点六面体实体单元,有限元模型如图3所示。3.2 计算过程
1
682008年第5期 王庆国,等:旋喷桩加固对控制盾构下穿铁路变形数值分析
图
2 地基加固平面图
Fig .2 Plan of foundati on reinforce ment
盾构施工过程的动态模拟采用刚度迁移法来
完成[11]
。主要步骤分以下几步:
(1)计算初始自重应力场,作为计算的初始阶段;
(2)盾构机推进一步,周围的等代层低刚度单
元“生”;
(3)盾构推进到第二步,第一步周围地层应力释放25%(偏于安全的取值
),第二步周围土体低刚度单元“生”;
(4)盾构推进到第三步,第一步预设管片单元“生”,同时对管片周围土体施加均布荷载,以模拟注浆压力的作用,第二步周围土体应力释放25%;
(5)盾构推进到第四步,第一步等代层低刚度单元“死”,高刚度单元“生”,用以模拟注浆对周围土体的加固作用
。
图3 有限元模型图
Fig .3 Finite ele ment module
3.3 计算结果分析
3.3.1 既有铁路的沉降对比分析
盾构隧道施工过程为:先推进下行线隧道,随
后推进上行线隧道,最后推进出入场段。在此仅对下行线隧道顶进过程中,有无旋喷桩存在时地表的变形规律进行研究,上行线和出入段顶进对地表的影响规律与此相同。既有铁路的沉降曲线如图4所示。
图4 下行线隧道推进过程中地表的沉降曲线
Fig .4 Vertical dis p lace ment of gr ound surface under shield driving
从图中可以看出,盾构隧道推进对既有铁路纵
向的影响长度为40m 左右,且沉降规律符合Peck 公式。未进行旋喷桩加固时,下行线隧道推进引起既有铁路的最大沉降量为21mm ,位于隧道中心正
268地下空间与工程学报 第4卷
上方,10m 弦长测量的高低最大失度值为10.0mm;而进行旋喷桩加固后,下行线隧道顶进过程中地上既有铁路的最大沉降值只有5mm ,10m 弦长测量的高低最大失度值为2.5mm 。根据《铁路线路维修规则》,当行车速度100k m /h ≤v ≤160km /h 时,10m 弦测量的高低最大失度值的作业验收值为4mm 。由此可知,不进行旋喷桩加固时,既有铁路
不能满足正常使用的要求,而加固后,既有铁路可以保证正常运营不受影响。旋喷桩存在能够有效阻滞盾构推进对铁路下方土体的挤压,从而有效控制既有铁路的沉降。3.3.2 隧道纵向地表沉降对比分析
同样,在此仅对下行线隧道推进过程中,有无旋喷桩时隧道纵向地表沉降规律进行对比分析,形曲线如图5所示。
从图中可以看出,盾构隧道推进过程中,有无
旋喷桩加固时,隧道纵向地表沉降规律是相同的,
即地面沉降主要发生在盾构机尾的位置,且纵向不均匀沉降量较大,特别是隧道穿越期,因此在盾构穿越过程中应加强对既有铁路的监测管理。
从图中同样可以看出,既有铁路两侧进行旋喷桩加固后,地面的最大沉降量有了明显减少,加固前既有铁路的最大沉降量为19mm 左右,最大不均匀沉降为1/1000,而加固后既有铁路的最大沉降量只有5mm 左右,最大不均匀沉降量为1/4000。从施工结束后地面的不均匀沉降来看,加固前地面的不均匀沉降较小,几乎是整体沉降,而进行加固后,旋喷桩内外地面的不均匀沉降较大,究其原因,主要是由于旋喷桩的存在阻滞了内外土层的相互联系。因此在具体施工中还应采取措施,控制旋喷桩内外地面的不均匀沉降
。
图5 下行线隧道推进过程中隧道纵向地面的沉降曲线
Fig .5 Vertical dis p lace ment of gr ound surface of the tunnel under shield driving
4 主要结论
通过以上三维有限元分析可知,在盾构隧道下穿既有铁路时,通过采取对铁路两层土体进行旋喷桩加固,可以有效地控制盾构推进引起的既有铁路的纵向和横向沉降及不均匀沉降,从而保证既有铁路的正常运营不受影响。但如何减小旋喷桩内外地面的不均匀沉降仍需进一步开展研究。
参考文献:
[1] 刘建航,侯学渊.盾构法隧道[M ].北京:中国铁道出
版社,1991,329-333.(L I U J ianhang,HOU Xueyuan .
Shield driven tunnel[M ].Beijing:China Rail w ay Press,1991,329-333.(in Chinese ))
[2] 张云,殷宗泽,徐永福.盾构法隧道引起的地表变形
分析[J ].岩石力学与工程学报,2002,21(3):388-392.(ZHANG Yun,YI N G Z ongze,XU Yongfu .Analy 2
sis on Three -D i m ensi onal gr ound surface defor mati ons due t o shield tunnel[J ].Chinese Journal of Rock Me 2chanics and Engineering,2002,21(3):388-392.(in Chinese )).
[3] 王敏强,陈胜宏.盾构推进隧道结构三维非线性有限
元仿真[J ].岩石力学与工程学报,2002,21(2):228
-232.(WANG M ingqiang,CHE N Shenghong .3-D i 2mensi onal non -linear finite element si m ulati on of tun 2nel structure f or moving -f or ward shield [J ].Chinese Journal of Rock Mechanics and Engineering,2002,21(2):228-232.(in Chinese ))
[4] It o T,H istake K .隧道掘进引起的三维地面沉陷分析
[J ].隧道译丛,1995,(9):46-55.(It o T,H istake K .Analysis on 3D gr ound surface settle ment by tunneling [J ].Tunnel Traslati ons 1995,(9):46-55.(in Chi 2nese ))
[5] 雷震宇,周顺华,许恺.铁路下穿式结构施工受轮轨
作用力的影响分析[J ].中国铁道科学,2003,24(6):
3
682008年第5期 王庆国,等:旋喷桩加固对控制盾构下穿铁路变形数值分析
na m ic Analysis of W heel/Rail I nteracti on During Con2
structi on of Tunnel under Rail w ay[J].China Rail w ay
Science,2003,24(6):70-73.(in Chinese))
[6] 许恺.地铁车站施工与铁路干线运营的相互影响
[D].上海:同济大学,2006.(XU Kai.I m pacts bet w een
M etr o Stati on Constructi on and Rail w ay Operati on[D].
Shanghai:Tongji University,2006.(in Chinese))
[7] 李林.既有铁路下软弱地层盾构隧道施工加固方案
[J].城市轨道交通研究,2005(3):50-55.(L I L in.
Shield Structure Tunnel Constructi on in Soft Gr ound
[J].U rban M ass Transit,2005(3):50-55.(in Chi2
nese))
[8] 吴波,高波,骆建军.地铁区间隧道水平旋喷预加固
效果数值模拟[J].西南交通大学学报,2004,39(5):
605-608.(WU Bo,G AO Bo,LUO J ianjun.Nu meri2
cal Si m ulati on of Reinforcing Effect of Horizontal D rill2
ing Jet-Gr outing Pegs on Shenzhen M etr o Tunnel be2
t w een Stati ons[J].Journal of South west J iaot ong Uni2
versity,2004,39(5):605-608.(in Chinese))
[9] 白廷辉,尤旭东,李文勇.盾构超近距离穿越地铁运
营隧道的保护技术[J].地下空间,1999,19(4):311
-316.(BA I Tinghui et al.The p r otecti on technique
during passing of shield thr ough the operating metr o tun2
nel[J].Undergr ound S pace,1999,19(4):311-316.
(in Chinese))
[10] 杨俊龙,孙连元,沈成明.盾构机穿越地铁隧道施工
技术研究简介[J].现代隧道技术,2004,(增):325
-329.(Y ANG Junl ong,S UN L ianyuan,S HE N Cheng2
m ing.B rief intr oducti on t o constructi on technol ogy of
shield-driven metr o tunnel[J].Modern Tunnel Tech2
nol ogy,2004,(supp):325-329.(in Chinese)) [11] 于宁,朱合华.盾构隧道施工地表变形分析与三维
有限元模拟[J].岩土力学,2004,25(8):1330-
1334.(Y U N ing,ZHU Hehua.Analysis of earth de2
for mati on caused by shield tunnel constructi on and3D
-FE M si m ulati on[J].Rock and S oil M echanics,
2004,25(8):1330-1334.(in Chinese))
(上接第839页)
[11] 黄宏伟.隧道及地下工程建设中的风险管理研究进
展[C].全国地铁与地下工程技术风险管理研讨会
论文集.2005.(HUANG Hong wei.Pr ogress in re2
search on risk management in tunnel and undergr ound
engineering[C].Pr oceedings of Nati onal Sy mposiu m
on risk manage ment of metr o and undergr ound engi2
neering technol ogy,2005.(in Chinese))
[12] M cFest-S m ith.R isk assess ment for tunneling in ad2
verse geol ogical conditi ons[C].Pr oceedings of the I n2
ternati onal Conference on Tunnels and Undergr ound
Structures.Singapore,2000:625-632.
[13] Clark G T,Borst A.Addressing risk in Seattle’s un2
dergr ound[J].P B Net w ork,2002(1):34-37. [14] 赵国藩,金伟良,贡金鑫.结构可靠度理论[M]北
京:中国建筑工业出版社,2000.(Z HAO Guofan,
J I N W eiliang,G ONG J inxin.Theory of structural reli2
ability[M].Beijing:China A rchitecture and Building
Press,2000.(in Chinese))
[15] 陈龙珠,龙小梅.基坑工程中土钉和水泥土墙支护
系统的FT A安全评估[C].全国地铁与地下工程技
术风险管理研讨会论文集,2005.(CHE N Longzhu,
LONG Xiaomei.FT A safety assess ment on s oil nail
and cement s oil wall support syste m in f oundati on engi2
neering[C].Pr oceedings of Nati onal Sy mposium on
risk manage ment of metr o and undergr ound engineering
technol ogy.2005.(in Chinese))
[16] Reilly J.,B r own J.Management and contr ol of cost
and risk for tunneling and infrastructure p r ojects[A
].Pr oceedings of world tunnel congress and13th I T A
asse mbly,Singapore[C].2004,B18.
[17] 郑承忠.福建海湾地区灾害地质特征与工程风险控
制[J].自然灾害学报,2005,14(4):108-114.
(Z HE NG Chengzhong.D isaster geol ogical characters
and engineering risk contr ol in Fujian bay area[J].
Journal of NaturalD isasters,2005,14(4):108-114.
(in Chinese))
[18] 余琼芳,陈迎松.模糊数学中隶属函数的构造策略
[J].漯河职业技术学院学报,2003,2(1):12-15.
(Y U Q i ongfang,CHE N Yings ong.For mati on strategy
for me mbershi p functi on in fuzzy mathematics[J].
Journal of Leihe I nstitute of Pr ofessi onal Technique,
2003,2(1):12-15.(in Chinese))
[19] 肖辞源.工程模糊系统[M].北京科学技术出版
社,2004:74-8.(X I A O Ciyuan.Engineering fuzzy
system[M].Beijing S&T Press,2004:74-8.(in
Chinese))
468地下空间与工程学报 第4卷