工程名称:甘肃鼎盛天祝松山滩一期49.5MW风电场项目110kV升压站电气安装调试工程 编号:SZLB3-001
| 工程编号 | 工 程 项 目 名 称 | 性 质 | 质检机构 验评范围 | 质量验评及签证 表编号 | |||||
| 单位工程 | 分部工程 | 分 项 工 程 | 施工单位 | 监理单位 | |||||
| 班 组 | 施工队 | 项目部 | |||||||
| 2 | 主控及直流设备安装 | √ | √ | √ | DL/T 5161.1-表4.0.3 | ||||
| 1.1 | 二次盘室设备安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 二次盘室基础安装 | √ | √ | DL/T 5161.8-表1.0.2 | |||||
| 1.2 | 二次盘室保护及自动化屏安装 | √ | √ | DL/T 5161.8-表1.0.2 DL/T 5161.8-表5.0.2 | |||||
| 3 | 二次盘室二次回路检查及接线 | √ | √ | DL/T 5161.8-表7.0.2 | |||||
| 2.1 | #1蓄电池组柜安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | #1蓄电池台架安装 | √ | √ | √ | √ | DL/T 5161.9-表1.0.2 | |||
| 1.2 | #1蓄电池安装 | √ | √ | √ | √ | DL/T 5161.9-表1.0.2 DL/T 5161.9-表2.0.2 | |||
| 2 | #1蓄电池充放电容量测定 | √ | √ | √ | √ | DL/T 5161.9-表3.0.3 DL/T 5161.9-表3.0.4 | |||
| 2.2 | #2蓄电池组柜安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | #2蓄电池台架安装 | √ | √ | √ | √ | DL/T 5161.9-表1.0.2 | |||
| 1.2 | #2蓄电池安装 | √ | √ | √ | √ | DL/T 5161.9-表1.0.2 DL/T 5161.9-表2.0.2 | |||
| 2 | #2蓄电池充放电容量测定 | √ | √ | √ | √ | DL/T 5161.9-表3.0.3 DL/T 5161.9-表3.0.4 | |||
| 3 | 110kV配电装置安装 | √ | √ | √ | DL/T 5161.1-表4.0.3 | ||||
| 1.1 | 110kV母线安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 110kV母线绝缘子串安装 | √ | √ | DL/T 5161.4-表2.0.2 | |||||
| 2 | 110kV母线软母线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 3 | 110kV母线支柱绝缘子安装 | √ | √ | √ | DL/T 5161.4-表7.0.2 | ||||
| 1.3 | 110kV 母线PT间隔母线安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 110kV 母线PT间隔母线绝缘子串安装 | √ | √ | DL/T 5161.4-表2.0.2 | |||||
| 2 | 110kV 母线PT间隔母线软母线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 3 | 110kV母线支柱绝缘子安装 | √ | √ | √ | DL/T 5161.4-表7.0.2 | ||||
| 2.1 | 110kV母线电压互感器及避雷器安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 110kV母线避雷器安装 | √ | √ | DL/T 5161.2-表6.0.2 | |||||
| 2 | 110kV母线电压互感器安装 | √ | √ | DL/T 5161.3-表3.0.2 | |||||
| 3 | 110kV母线隔离开关及接地开关安装 | √ | √ | √ | √ | DL/T 5161.2-表5.0.1 | |||
| 4 | 110kV母线支柱绝缘子安装 | √ | √ | DL/T 5161.4-表2.0.3 | |||||
| 5 | 110kV母线引下线及跳线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 6 | 110kV母线端子箱安装 | √ | √ | DL/T 5161.8-表1.0.2 DL/T 5161.8-表4.0.2 | |||||
| 3.1 | 110kV南山变出线间隔安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 110kV110kV南山变出线间隔隔离开关安装 | √ | √ | √ | √ | DL/T 5161.4-表5.0.1 | |||
| 2 | 110kV南山变出线间隔断路器安装 | 主要 | √ | √ | √ | √ | DL/T 5161.2-表2.0.1 | ||
| 3 | 110kV南山变出线间隔电流互感器安装 | √ | √ | DL/T 5161.3-表3.0.2 | |||||
| 4 | 110kV南山变出线间隔避雷器安装 | √ | DL/T 5161.2-表6.0.2 | ||||||
| 7 | 110kV南山变出线间隔引下线及跳线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 8.1 | 110kV南山变出线间隔端子箱基础安装 | √ | √ | DL/T 5161.8-表1.0.2 | |||||
| 8.2 | 110kV南山变出线间隔端子箱安装 | √ | √ | DL/T 5161.8-表4.0.2 |
| 3.3 | 110kV南山变出线间隔安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 110kV南山变出线间隔甲刀闸安装 | √ | √ | √ | √ | DL/T 5161.4-表5.0.1 | |||
| 1.2 | 110kV南山变出线间隔乙刀闸安装 | √ | √ | √ | √ | DL/T 5161.4-表5.0.1 | |||
| 2 | 110kV南山变出线间隔断路器安装 | 主要 | √ | √ | √ | √ | DL/T 5161.2-表2.0.1 DL/T 5161.2-表2.0.2 | ||
| 3 | 110kV南山变出线间隔电流互感器安装 | √ | √ | DL/T 5161.3-表3.0.2 | |||||
| 4 | 110kV南山变出线间隔避雷器安装 | √ | √ | DL/T 5161.2-表6.0.2 | |||||
| 6 | 110kV南山变出线间隔支柱绝缘子安装 | √ | √ | DL/T 5161.3-表2.0.2 | |||||
| 7 | 110kV南山变出线间隔引下线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 8.1 | 110kV南山变出线间隔端子箱基础安装 | √ | √ | DL/T 5161.8-表1.0.2 | |||||
| 8.2 | 110kV南山变出线间隔端子箱安装 | √ | √ | DL/T 5161.8-表4.0.2 | |||||
| 3.3 | 1#主变进线间隔安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 1#主变进线间隔甲刀闸安装 | √ | √ | √ | √ | DL/T 5161.4-表5.0.1 | |||
| 1.2 | 1#主变进线间隔乙刀闸安装 | √ | √ | √ | √ | DL/T 5161.4-表5.0.1 | |||
| 2 | 1#主变进线间隔断路器安装 | 主要 | √ | √ | √ | √ | DL/T 5161.2-表2.0.1 DL/T 5161.2-表2.0.2 | ||
| 3 | 1#主变进线间隔电流互感器安装 | √ | √ | DL/T 5161.3-表3.0.2 | |||||
| 4 | 1#主变进线间隔避雷器安装 | √ | √ | DL/T 5161.2-表6.0.2 | |||||
| 6 | 1#主变进线间隔支柱绝缘子安装 | √ | √ | DL/T 5161.3-表2.0.2 | |||||
| 7 | 1#主变进线间隔引下线安装 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 8.1 | 1#主变进线间隔端子箱基础安装 | √ | √ | DL/T 5161.8-表1.0.2 | |||||
| 8.2 | 1#主变进线间隔端子箱安装 | √ | √ | DL/T 5161.8-表4.0.2 |
| 10 | 110kV配电装置带电试运 | 主要 | √ | √ | √ | DL/T 5161.1-表5.0.5-1 | |||
| 5 | 35kV配电装置安装 | √ | √ | √ | DL/T 5161.1-表4.0.3 | ||||
| 1.1 | 1# 干式变压器安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 1#干式变压器本体安装 | √ | √ | DL/T 5161.4-表2.0.2 | |||||
| 2 | 1#干式变压器本体检查 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 3 | 1#干式变压器附件安装 | √ | √ | √ | DL/T 5161.4-表7.0.2 | ||||
| 3 | 1#接地变压器附件安装 | √ | √ | √ | DL/T 5161.4-表7.0.2 | ||||
| 1.2 | 变压器中性点接地电阻柜安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 变压器中性点接地电阻柜本体安装 | √ | √ | DL/T 5161.4-表2.0.2 | |||||
| 2 | 变压器中性点接地电阻柜本体检查 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 3 | 变压器中性点接地电阻柜附件安装 | √ | √ | √ | DL/T 5161.4-表7.0.2 | ||||
| 3 | 35kV配电柜安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 基础型钢安装 | √ | √ | DL/T 5161.2-表6.0.2 | |||||
| 2 | 光伏出、进线柜、PT柜、无功补偿柜安装 | √ | √ | DL/T 5161.3-表3.0.2 | |||||
| 3 | 母线安装 | √ | √ | √ | √ | DL/T 5161.2-表5.0.1 | |||
| 4 | 断路器检查 | √ | √ | DL/T 5161.4-表2.0.3 | |||||
| 5 | 二次回路检查接线 | √ | √ | √ | √ | DL/T 5161.4-表7.0.2 | |||
| 4 | 380V站用低压配电装置安装 | √ | √ | √ | DL/T5161.1-表4.0.2 | ||||
| 1 | 380V干式变压器安装 | √ | √ | DL/T5161.3-表1.0.1 | |||||
| 2.1 | 380V低压配电柜基础型钢安装 | √ | √ | DL/T5161.8-表1.0.2 |
| 2.2 | 380V低压配电柜安装 | √ | √ | DL/T5161.3-表1.0.1 DL/T5161.3-表1.0.2 | |||||
| 3.1 | 380V低压配电柜母线安装 | √ | √ | √ | √ | DL/T5161.4-表3.0.2 | |||
| 4 | 380V低压配电柜二次回路检查及接线 | √ | √ | DL/T5161.8-表7.0.2 | |||||
| 10 | 35KV室内配电装置系统设备带电试运 | 主要 | √ | √ | DL/T5161.1-表5.0.5-2 DL/T5161.1-表5.0.5-3 | ||||
| 7 | 全站电缆施工 | √ | √ | √ | DL/T 5161.1-表4.0.3 | ||||
| 1 | 电缆管配制及敷设 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 主控制室电缆管配制及敷设 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.2 | 110kV屋外配电设备电缆管配制及敷设 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.3 | 主变系统区域电缆管配制及敷设 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 2 | 全站电缆支架制作及安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 110kV屋外配电装置区域电缆支架安装 | √ | √ | DL/T 5161.5-表1.0.3 | |||||
| 1.2 | 主变压器系统区域电缆支架安装 | √ | √ | DL/T 5161.5-表1.0.3 | |||||
| 1.3 | 主控室电缆支架安装 | √ | √ | DL/T 5161.5-表1.0.3 | |||||
| 1.6 | 35kV配电室电缆支架安装 | √ | √ | DL/T 5161.5-表1.0.3 | |||||
| 1.8 | 无功补偿装置电缆支架安装 | √ | √ | DL/T 5161.5-表1.0.3 | |||||
| 3 | 电缆敷设 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 110kV屋外配电装置区域电缆敷设 | √ | √ | DL/T 5161.5-表2.0.2 | |||||
| 1.2 | 主变压器系统区域电缆敷设 | √ | √ | DL/T 5161.5-表2.0.2 | |||||
| 1.3 | 主继电器室电缆敷设 | √ | √ | DL/T 5161.5-表2.0.2 | |||||
| 1.4 | 35kV配电室电缆敷设 | √ | √ | DL/T 5161.5-表2.0.3 |
| 1.7 | 无功补偿装置区域电缆电缆敷设 | ||||||||
| 4 | 电力电缆终端及中间接头制作 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 1ZYB-01电力电缆终端制作安装 | √ | √ | DL/T 5161.5-表3.0.4 | |||||
| 1.2 | 2ZYB-02电力电缆终端制作安装 | √ | √ | DL/T 5161.5-表3.0.4 | |||||
| 1.5 | 1DRQ-A电力电缆终端制作安装 | √ | √ | DL/T5161.5-表3.0.4 | |||||
| 1.6 | 1DRQ-B电力电缆终端制作安装 | √ | √ | DL/T5161.5-表3.0.4 | |||||
| 1.7 | 1DRQ-C电力电缆终端制作安装 | √ | √ | DL/T5161.5-表3.0.4 | |||||
| 5 | 控制电缆终端制作及安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | 110kV屋外配电装置区域控制电缆终端制作及安装 | √ | √ | DL/T 5161.5-表3.0.3 | |||||
| 1.2 | 主变压器系统区域控制电缆终端制作及安装 | √ | √ | DL/T 5161.5-表3.0.3 | |||||
| 1.3 | 主继电器室控制电缆终端制作及安装 | √ | √ | DL/T 5161.5-表3.0.3 | |||||
| 1.4 | 110kV配电装置室控制电缆终端制作及安装 | √ | √ | DL/T 5161.5-表3.0.3 | |||||
| 1.5 | 35kV无功补偿电缆控制电缆终端制作及安装 | √ | √ | DL/T 5161.5-表3.0.3 | |||||
| 6 | 35kV及以上电缆线路施工 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 1ZY-01站用变110kV #1站用变开关柜~110kV#1站用变低压侧电缆施工 | √ | √ | DL/T 5161.5-表3.0.4 | |||||
| 7 | 电缆防火与阻燃 | √ | √ | √ | √ | DL/T 5161.5-表5.0.2 | |||
| 1.1 | 110kV屋外配电装置区域电缆防火与阻燃 | √ | √ | √ | √ | DL/T 5161.5-表5.0.2 | |||
| 1.3 | 主控制室及通讯室电缆防火与阻燃 | √ | √ | √ | √ | DL/T 5161.5-表5.0.2 | |||
| 8 | 全站防雷及接地装置安装 | √ | √ | √ | DL/T 5161.1-4.0.3 | ||||
| 2 | 接地装置安装 | √ | √ | √ | DL/T 5161.1-4.0.2 |
| 1.1 | 110kV屋外配电装置区域接地装置安装 | 主要 | √ | √ | √ | √ | DL/T 5161.6-1.0.2 | ||
| 2.1 | 主控制室接地装置安装 | 主要 | √ | √ | √ | √ | DL/T 5161.6-2.0.2 | ||
| 2.3 | 35kV配电室保护室接地装置安装 | 主要 | √ | √ | √ | √ | DL/T 5161.6-2.0.2 | ||
| 10 | 通信系统设备安装 | √ | √ | √ | DL/T 5161.1-表4.0.3 | ||||
| 1 | 通信系统一次设备安装 | √ | √ | √ | √ | DL/T 5161.1-表4.0.2 | |||
| 1 | 通信系统一次设备安装 | √ | √ | √ | √ | DL/T 5161.1-表6.0.1 | |||
| 2 | 微波通信设备安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1 | 微波天线安装 | √ | √ | √ | √ | DL/T 5161.1-表6.0.2 | |||
| 2 | 微波馈线 | √ | √ | √ | √ | DL/T 5161.1-表6.0.3 | |||
| 3 | 微波机、光端及设备安装 | √ | √ | √ | √ | DL/T 5161.1-表6.0.4 | |||
| 4 | 程控交换机安装 | √ | √ | √ | √ | DL/T 5161.1-表6.0.5 | |||
| 3 | 通信蓄电池安装 | √ | √ | √ | DL/T 5161.1-表4.0.2 | ||||
| 1.1 | #1免维护蓄电池组安装 | √ | √ | √ | √ | DL/T 5161.1-表6.0.6 | |||
| 2.1 | #1通信蓄电池组充放电签证 | √ | √ | √ | DL/T 5161.1-表6.0.7 |