最新文章专题视频专题问答1问答10问答100问答1000问答2000关键字专题1关键字专题50关键字专题500关键字专题1500TAG最新视频文章推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37视频文章20视频文章30视频文章40视频文章50视频文章60 视频文章70视频文章80视频文章90视频文章100视频文章120视频文章140 视频2关键字专题关键字专题tag2tag3文章专题文章专题2文章索引1文章索引2文章索引3文章索引4文章索引5123456789101112131415文章专题3
当前位置: 首页 - 正文

SCC1350E

来源:动视网 责编:小OO 时间:2025-09-24 12:56:21
文档

SCC1350E

SCC1350ESANYCRAWLERCRANESCC1350ECrawlerCraneBasicsizeofoverallcraneMaintechnicalcharacteristicsPerformanceparameterTransportationdimensionTransportprogramSchematicdiagramofdisassemblyDetailedintroductionUpperworksLowerworksOperationequipmentSafetyde
推荐度:
导读SCC1350ESANYCRAWLERCRANESCC1350ECrawlerCraneBasicsizeofoverallcraneMaintechnicalcharacteristicsPerformanceparameterTransportationdimensionTransportprogramSchematicdiagramofdisassemblyDetailedintroductionUpperworksLowerworksOperationequipmentSafetyde


SCC 1350E

SANY CRAWLER CRANE

SCC1350E Crawler Crane

Basic size of overall crane

Main technical characteristics

Performance parameter

Transportation dimension

Transport program

Schematic diagram of disassembly

Detailed introduction

Upperworks

Lowerworks

Operation equipment

Safety device

Combination of Operating Modes

Working condition combination

Boom H working condition

Fixed jib FJ working condition

content

P3

P12

P19

04Main technical characteristics

05Performance parameter

10Schematic diagram of disassembly CRAWLER CRANEMain technical characteristics Basic size of overall crane

1.Powerful lifting capacity

For the main boom, the maximum lifting capacity is 140t, the maximum lifting moment is 95.4t×7m=668t·m, and the maximum length is 80m. For the fixed jib, the maximum lifting capacity is 30t, and the longest combination is 65m+31m.

2. Global transportation standard

The basic crane is 32.8t in transport weight and 3m in transport breadth, and saves the transportation cost.

3.Most economical transportation mode Transported by 5 vehicles (80m boom+31m jib).

4.Efficient self-assembly technology Capable of achieving self-assembly of basic crane; capable of achieving self-assembly of crawler frame, central ballast, counterweight and boom system. The self-assembly time is less than 7h.

5.Special function application (optional) The main and auxiliary hooks operate simultaneously.

S of slewing area limiting technology

Limiting technology of boom system working area

6.Calibration-free technology of load moment limiter

No need for recalibration during switching of the working condition. The construction is more efficient, and it is more convenient to use.

7.Safe control system

It has operation and installation modes, thus being convenient and reliable; it is equipped with the electronic level meter for real-time display; it has the functions, such as off-line stop, emergency electric control, lightning protection, automatic reversing while traveling and closed-circuit monitoring, and a complete safety and monitoring system.8. Excellent operating performance

The load sensing, ultimate load regulation and electro-hydraulic propor tional dead slow control ensures excellent micro-motion of each action, and smoother operation.

9.Strong power supply

The third- stage emission engine of SDEC has 251KW power and is powerful and low-carbon.

10.Reliable function guarantee

The key parts are products of well-known brands; the structure design and mechanism design are safe and reliable; the control system can run steadily in arctic-alpine, high-temperature, highland and harsh sandstorm environments.

11.Wide adaptability

Comply with the certification of CE, North America, Australia, Russia and Taiwan, and third-stage off-road emission standard in Europe and America, and can be widely used in the industries such as shipbuilding, subway, thermal power, municipal engineering, and metallurgy.

12.More optional functions

Optional luffing jib working condition.

Optional double-free fall.

Optional counterweight self-assembly.

Optional fuel and hydraulic oil heating device.

Optional high-pressure alarm system.

Optional automatic forward function.

Transport a tion dimension

Performance parameter

Transport a

tion dimension

Transport a tion dimension Notes:

1. It's a schematic diagram of transport dimension of the spare part, which is not drawn to scale. The marked dimension is the design value, excluding the packaging.

2. The weight is a design value, and may be slightly different due to the manufacturing error.

disassembl y

Transport program

1) Self-assembly of basic crane

2) Self-assembly of crawler frame

3) Self-assembly of central ballast

4) Self-assembly of counterweight

5) Self-assembly of boom

SANY CRAWLER CRANE

SCC1350E

SANY CRAWLER CRANE SCC1350E Main hoisting device

Rope speed of outermost working layer 0-140m/min

Diameter of wire rope

26mm Length of wire rope of main winch 360m Rated single rope pulling force

12t

Auxiliary hoisting device

Rope speed of outermost working layer 0-140m/min

Diameter of wire rope

26mm Length of wire rope of auxiliary winch 260m Rated single rope pulling force

12t

Det ailed introduction

Upperworks

1)Engine

■SC9DF340Q3 in-line six-cylinder, four-stroke, water-cooled, turbo charged and intercooled electronic control diesel engine of SDEC have 251kW rated power and 2200rpm rated speed. The maximum output torque is 1,430Nm/1,400rpm.

■It complies with the third-stage non-road emission standard.

■Fuel tank: the volume is 400L, and the fuel capacity is shown by oil pointer and electronically.

2)Electrical control system

■It employs the advanced central control unit, torque limiter, display, sensor and closed-circuit monitoring system.

■Reliability: the main electrical devices are products of the international or intra-industry famous brands, and can run steadily in arctic-alpine, high-temperature, highland and harsh sandstorm environments.

■Safety: the electrical design fully meets the CE standard, with complete multistage safety limit control and safety signal indications.

■Comfort: all electrical parameters can be seen through the combination instrument in the cab, and the working parameters and working condition are monitored in real time.

■Advanc ement: the electric al CA N bus system constitution of the overall crane, limit load control of load power, redundant communication check, and optional global positioning.

3)Hydraulic system

■The hydraulic system includes: main valve hydraulic system, main hoist hydraulic system, boom luffing hydraulic system, auxiliary hydraulic system, etc.

■Feature: the main system is an open circuit and widely employs electronic proportional control elements. The system is a load-sensitive LUDV system, can achieve the fl ow distribution irrelevant to the load, employs the hydraulic proportional pilot control and is sensitive in operation and good in micro-motion.

4)Main and auxiliary hoisting devices

■The variable motor of hoisting mechanism can steplessly adjust the winch speed according to the lever control signal and automatically control the motor displacement according to the load condition to achieve the automatic balance between safety and speed of the winch.

■The variable hydraulic motor of hoisting mechanism can automatically adjust the displacement according to the load to achieve the maximum winch speed.

■It employs the high-quality anti-rotating wire rope, with high hoisting safety and long service life.

Upperworks 12Operation equipment

15Safety device

16

5)Boom luffing device

■The boom luffing drum has the pawl and ratchet locking device to ensure the placement safety of boom in non-operating state.

7)Counterweight

■Central ballast: 2 in total, and total weight: 20t (10t ×2)

■Counterweight: 5.5t counterweight block, 8 in total, a 10t counterweight tray, and total weight: 54t.

8)Cab

■The newly designed fully-enclosed broad-vision cab with SANY unique style is provided with adjustable seat and air conditioner.

■It has four headlamps to provide lighting for long and short distances.

■With large glass windows, and rearview mirrors, the vision is wider.

■The armrest box can be adjusted for ward and backward with the seat, is comfortable to operate and accords with man-machine engineering principle.

9)Control operation

■The traveling system has automatic forward function (optional), i.e., no matter how the upperworks slew, the upperworks are always the forward direction of operator.

■The actions of main winch, auxiliary winch, luffing device and slewing mechanism are controlled by switching the functions of control lever;

■The operating buttons, control switch, air conditioning control panel, etc. are distributed on the left and right armrest boxes to achieve its different control functions.

10)Alarm display

■When all alarm information, including wind speed, coolant temperature, oil temperature, fuel capacity, oil pressure, working time, engine revolution, etc., is faulty, they will be shown on display screen in the cab and, a sound-light alarm is given simultaneously.

Lowerworks

1)Travel drive device

■Each crawler has an independent travel drive device. The hydraulic travel motor drives the planet gear speed reducer to achieve independent travel by transmission from the driving wheel.

2)Travel brake

■Travel brake is a normally closed brake installed in the reducer, which can carry out compensation automatically and is not required to be adjusted. The brake is released when stepping on the control pedal valve, thus achieving travel.

3)Crawler pad

■Crawler pad is made from the material with high strength and high wear resistance, and its tension can be adjusted by hydraulic jack after installed on the equipment. The ideal tension can be achieved by adjusting the position of the shim plate.

4)Base

■The drive power pin of hydraulic cylinder is connected with the crawler frame, which is convenient for the installation and dismantling. It employs high-strength steel wielding frame structure.

■The design of large chassis obviously improves the stability of the overall crane.

■The central ballast is 20t, and the front and rear counterweights are 10t. The self-assembly can be

achieved.

6)Slewing mechanism

■It employs three-row roller slewing bearing, and large-displacement single-motor reduction gear drive; the slewing speed is 0-2.2r/min; it has the function of neutral-position free slipping and can provide 360° slewing. When the hand lever is in neutral position, and the slewing speed is 0, the brake is off, and the slewing mechanism is in lock state and is provided with a locking device. When traveling while hoisting, or transporting, avoid the slewing impact of the upper part.

1)Boom

■Main chord is made of high-strength material, and the boom system employs a space truss structure with uniform section in the middle and variable section at both ends.

■The standard boom has a 7m base, a 10m tip, a 3m intermediate section, four 6m intermediate sections and three 12m intermediate sections.

■The length of the boom is variable between base boom (17m) and the maximum length (80m), which increases progressively by 3m.

■The boom extension is installed on boom tip.2)Fixed jib

■Main chord is made of high-strength material. The

boom system employs a space truss structure with

uniform section in the middle and variable section at

both ends.

■The f ixed jib has a 5m base, a 5m tip, a 3m

intermediate section, and three 6m intermediate

sections.

■The lengths of the fixed jib are 13m, 16m, 19m, 22m,

25m, 28m and 31m.

■It can be installed on the boom with length between

17m and 71m.

3)Hook block

■13.5T ball hook

■35T lifting hook

■80T lifting hook

■130T lifting hook

Safety device

1)Load moment limiter

■The load moment limiter is a matched safety protection

system specially designed for SANY SCC series boom

crawler crane, in which the performance structure

parameters, such as bearing curve, boom weight,

center of gravity and other geometrical parameters, of

SANY crawler cranes of all series are stored directly.

A specific optimization model is employed for the

moment calculation, which integrates the technology

accumulation of SANY in the crawler crane field for

years, has the customized advantage, gives play to the

utilization efficiency of the crane to the greatest extent

while ensuring the lifting safety and avoids technology

disconnection and difficult after-sales service due to the

separation of the crane manufacturer from load moment

limiter manufacturer in the past, thus achieving the

improvement of the quality of the overall crane.

■As the independent safety control system completely

controlled by computer, the load moment limiter can

detect the lifting weight, operating radius and boom angle

of the crane automatically and compare them with the

rated load capacity, actual load, actual operating radius

and actual boom angle. It can intelligently determine and

stop the action of the crane in dangerous direction during

normal operation, and has the function of black box to

record the overload lifting information.

■It mainly consists of display, controller, angle sensor and

force sensor.

2)Three-colored load warning lamp

■It reflects the load safety condition of the lifting device,

corresponding to the status display of the load progress

bar on the display of the load moment limiter.

3)Over-hoist limit switch of boom and jib

hooks

■When the lifting hook hoists to the upper height limit, the

warning information will be generated, and the hoisting

action of the lifting hook will be stopped at the same time.

4)Over roll-out limit switch of boom and

jib hooks

■When the wire rope rolls out to the last three turns, the

warning information will be generated, and the electrical

control system automatically stops roll-out action of the

winch.

5)Installation/operating mode changeover

switch

■The over-hoist limit switch, crane boom limit device, load

moment limiter, etc. don’t function in the installation

mode for the convenient installation of the crane.

■All safety limit devices function in the operating mode.

6)Crane boom limit detecting device

■Under different working conditions, it detects the limit

switch and angle signal of the boom system of load

moment limiter system to control the boom or jib of the

crane to operate in a safe angle.

7)Crane boom back-stop device

■The boom employs the oil cylinder back-stop structure to

prevent the back-stop of the boom.

■The mechanical back-stop device will prevent back-stop

when the fixed jib to boom angle is too small.

8)Winch mechanism brake

■Each winch brake employs spring-load normally closed

disc brake with great braking force, no maintenance,

safety and reliability and long service life.

9)Closed circuit monitoring system

■It employs high-definition camera, and the operator in the

cab can monitor the real-time status of the luffing drum,

lifting winch drum and tail.10)Fault self-diagnosis system

It can generate fault alarm information automatically, check the live operating state of the electrical line and help to remove electrical fault rapidly.

11)Navigation mark light

It is installed on the top of the boom system, which allows the boom system to give prompt at high altitude, and the boom is not required to be lowered at night.

12)Anemometer

It is installed on the top of the boom system to monitor the wind speed in real time and transmits the data to the cab to be displayed on the monitor.

13)Gradienter

The bubble gradienter is used as the check base, and the electronic gradienter as the real-time high precision display to display the inclination angle of the crane and prompt the safe operation ground environment of the crane.

14)Unhooking prevention device for hook block

Each lifting hook is equipped with a baffl e to prevent the wire rope from falling off.

15)Operation alarm

Sound the horn for alarm to prompt that the crane is to be operated to remind other persons to be careful before operating it.16)Travel or slewing prompt

During traveling or slewing operation, the operation warning

light will fl ash with buzzing.

17)Functional locking

When the operator leaves the seat or the functional locking

lever isn't in position, the control levers of all other functions

will fail, thus effectively avoiding some misoperations.

18)Automatic reversing travel (optional)

Regardless of the relative positions of the upperworks

and lowerworks, the overall crane will travel forward and

backward when pushing the travel pedal forward and pulling

the travel pedal backward respectively.

19)Monitor display

It is a high-precision true-color display and employs overall

crane electric man-machine conversation display terminal. It

can display the operating states and real-time parameters of

engine system, hydraulic system, electrical system, etc.

20Boom H working condition

24Fixed jib FJ working condition

Working condition combina tion Boom H working condition Fixed jib FJ working condition

Boom H working condition: 17m-80m

Boom H working condition

Length Intermediate section

Mid-point suspension cable

(m ) 3 m 6 m 12m Note: Choose any intermediate section for the combination with the same boom length, preferably the longer intermediate section.

Boom combination

Top 10m

12m Boom

Butt 7m

3m Boom 6m Boom

Diagram of opera tion range of boom working condition

Load t

able of boom

Load table of H working condition of SCC1350E crawler crane

Diagram of operation range of boom (H) working condition

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook.

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

85

807570

6560

555045403530252015105

Operation radius (m)

051015202530354045505560657075

Boom length (m)

80m 77m 74m 71m 68m 65m 62m 59m 56m 53m 50m 47m 44m 41m 38m 35m 32m 29m 26m 23m 20m 17m

15°

20°

30°

40°

50°

60°

70°

80°

86°

Fixed jib FJ working condition

Load t

able of boom

Load table of H working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook.

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Jib length (m)Intermediate section Boom length

(m)

Boom to jib angle (m )

3 m 6 m Note:

The boom less than 35m has the interval of the boom length of 6m;The boom greater than 35m has the interval of the boom length of 3m.

Fixed jib combination

Fixed jib FJ working condition:

(17m-71m) + (13m-31m)

Base 7m

Tip 10m

3m boom 12m boom

6m jib

3m jib 6m boom 5m jib base 5m jib tip

Diagram of opera tion range of fixed jib

Diagram of operation range of fixed jib (FJ) working condition

Load t

able of fixed jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

100

9590

858075706560

555045403530252015105

Operating radius (m)

05101520253035404550556065

707580Jib length (m)

71m 68m 65m 62m 59m 56m 53m 50m 47m 44m 41m 38m 35m 29m 23m 17m

15°

86°

30°

70°

60°

50°

40°

30°

17m+31m

17m+28m 17m+25m

17m+22m

17m+19m 17m+16m 17m+13m

65m+31m 65m+28m 65m+25m

65m+22m

65m+19m 65m+16m

65m+13m

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground. Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground. Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.

Load Chart of Fixed Jib

Load table of fixed jib FJ working condition of SCC1350E crawler crane

Notes:

1. The actual lifting weight is equal to the value that the rated lifting weight in the table subtracts the weight of all the lifting devices such as lifting hook

2. The rated lifting weight in the table is the weight of the non-traveling weight which is lifted slowly and steadily from the hard level ground.