最新文章专题视频专题问答1问答10问答100问答1000问答2000关键字专题1关键字专题50关键字专题500关键字专题1500TAG最新视频文章推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37视频文章20视频文章30视频文章40视频文章50视频文章60 视频文章70视频文章80视频文章90视频文章100视频文章120视频文章140 视频2关键字专题关键字专题tag2tag3文章专题文章专题2文章索引1文章索引2文章索引3文章索引4文章索引5123456789101112131415文章专题3
当前位置: 首页 - 正文

Configuration Management Plan Template

来源:动视网 责编:小OO 时间:2025-09-29 02:31:02
文档

Configuration Management Plan Template

ConfigurationManagementPlanProjectname:Date:February7,2012Version:2.6xAuthor:Listofreviewers:ProjectManagerProjectProcessAdvisorRevisions:DateNumberModifiedsectionsDescriptionofchangesInstructionstoAuthorsTextinblueisusedforinstructionsorexamples.It
推荐度:
导读ConfigurationManagementPlanProjectname:Date:February7,2012Version:2.6xAuthor:Listofreviewers:ProjectManagerProjectProcessAdvisorRevisions:DateNumberModifiedsectionsDescriptionofchangesInstructionstoAuthorsTextinblueisusedforinstructionsorexamples.It
  

Configuration Management Plan

Project name: 

Date:     February 7, 2012

Version:  2.6x

Author: 

    

List of reviewers:Project Manager 

Project Process Advisor

Revisions:

DateNumberModified sectionsDescription of changes
Instructions to Authors

Text in blue is used for instructions or examples. It must be deleted from the document if not used or changed to black if used. 

In the final version, all text must be black, except hyperlinks.

Table of contents

1.Change Control Board

1.1Participants and responsibilities

This section lists the persons involved in the project CCB and their respective roles:

RolePerson and contact infoResponsibility
Project Manager
Configuration Manager
Project Architect
Test Lead
2.Configuration Management Tools

2.1Version Control System

The Version Control System to be used on the project is the standard VCS tool (Perforce). The project materials are located under .

2.2Issue Tracking System

The Issue Tracking System to be used on the project is JIRA. The project materials are located in [] < specify link>. 

2.3Project materials locations

All additional project materials (not subject for version tracking) are stored in the following shared file locations:

∙\\\\[fileserver]\\work\\projects\\

E-mail project information is kept in:

Public folders/ All public folders/ Projects/// - information to and from customer significant for team use, other useful e-mails. Access is opened for team. 

Public folders/ All public folders/ Projects/// Project Archive/ – information to and from customer for management use. Access rights limited. 

3.Development Environment

3.1Operating system(s)

3.2Compiler(s)

3.3Database engine

3.4

4.Build Procedure

4.1Building the product

4.2Database initialization

4.3Creating the installation package

4.4Baselining the product

Product is baselined after each milestone delivery to customer.

Baselining is done by labelling depot///.

Label format is .

CM is responsible for product baselining.

4.5Baseline changing

5.Installation Procedure

6.Daily Build and Smoke Test Procedure

7.Packaging and Delivery

1.Delivery via product packaging.

 Cover the following points:

What components should be included into the package;

What documentation should be included into the package;

How the package should be produced (using Zip, etc.);

How the package should be delivered (by e-mail, FTP address, etc.);

How the database should be created and initialized in customer’s environment

2.Delivery via VCS common with customer. 

Cover the following points:

Specify VCS directories with product parts treated as delivery

Specify delivery regularity: e.g. end of iteration, weekly, as soon as discussed functionality is implemented

3.Delivery via uploading product to the server visible for customer.

Specify server location (in-house/customer), responsible for configuration if server is external 

Specify server name and needed access rights

Specify required components and specific settings needed for uploading if any

Specify how customer is notified about implemented functionality and known bugs (delivery notes; e-mail with specific report; free e-mail form; specific practices as show-sessions with result minutes; defect database with customer access.)

Person responsible for delivery should be specified in section 3.1.>

8.Configuration Audits

Configuration audits listed in following table are planned on project. 

Audit typeVerification itemsTime to performExecutors 
Physical configuration auditVerifies procedures like environment setup, build procedure, installation procedureExternal expert/Newcommer
Functional configuration auditVerifies real usage and actuality of Configuration Items defined in CM Plan

Intermediate Delivery auditVerifies delivery procedure, Integrity of the delivery Package and delivery notes if used on project

Final Delivery auditIntegrity of the delivery Package and delivery notes if used on project

Audit materials are placed in []. //Doc/Reviews/. Reference to standard or customized placement in case no formal reporting is used i.e. e-mails with CM Audit subject in Project Public folder >

9.References and Glossary

9.1References

NumberDocument (Publication)Location
9.2Glossary

This section defines the special elements (terms, abbreviations, and acronyms) used in this document, and are not necessarily element names used in the product itself. Special elements are those invented for this document or those used in some way differently than ordinary, everyday English usage.

Term/AcronymMeaning

文档

Configuration Management Plan Template

ConfigurationManagementPlanProjectname:Date:February7,2012Version:2.6xAuthor:Listofreviewers:ProjectManagerProjectProcessAdvisorRevisions:DateNumberModifiedsectionsDescriptionofchangesInstructionstoAuthorsTextinblueisusedforinstructionsorexamples.It
推荐度:
  • 热门焦点

最新推荐

猜你喜欢

热门推荐

专题
Top