Contract No. (合同编号):
Date (日 期):
System Handover Form
工程验收单
SECURITY SYSTEM (保安监视系统) | —— |
CCTV SYSTEM (闭路电视监察系统) | —— |
ACCESS CONTROL SYSTEM (通道进出管理系统) | —— |
FIRE ALARM SYSTEM (消防探测报警系统) | —— |
CARPARK SYSTEM (停车场管理系统) | —— |
INTERCOM SYSTEM (仿客/住户对讲系统) | —— |
PERAMBULATE SYSTEM (电子巡更系统) | —— |
OTHER SYSTEM (其他体统) | —— |
Protected premises (安 装 地 点) :
Handover date (调试完成日期) :
Chubb engineer ( 系统移交人) :
ACCETANCE(认可)
System operation including computer operating and programming have been explained clearly to We/us (“the client”) by the engineer who is from BeijingXXXX fire security systems Co., Limited .All the system equipment keys and the relevant system programming introduction have been handed over
系统的操作(含电脑操作、编程式)由北京XXXX系统工程有限公司派出之工程人员,向本人/本公司人员讲解清楚。所有系统器材所有之锁匙(如适用)及有关系统变成说明书, 亦已全部收妥。
I/We (“the client”) confirm that the system works.
本人/本公司确认系统运行正常。
Signature (Chop) Date
签名及盖章 日期