【摘要】大滩水电站水轮发电机组运行近20年,发电机定子线圈很多部位绝缘老化。根据电站水能参数和机组实际情况,通过详细计算分析,可不改动水轮机,仅对发电机作增容改造,采用增加发电机定子线圈导线截面,绝缘采用F级;而发电机转子也不作改变出力由1000kW 增至1250kW。改造后机组噪音、振动、各部温升均符合要求,投资省、时间短、发电损失少,取得了很好的经济效益。
【关键词】水电站水轮发电机定子线圈转子绝缘经济效益
Abstract: Greater Ertan Hydropower Station, hydroelectric generating set running nearly 20 years, many parts of the generator stator coil insulation aging. By detailed calculations according to the parameters and the unit of Hydro Energy may from time to changes in the turbine, generator only for Rehabilitation, the increase in wire cross-section of the generator stator coil insulation class F; generator rotor is not to make changes to output from 1000kW to 1250kW. After transformation unit noise, vibration, departments temperature rise to meet the requirements, investment, time is short, less power loss, and achieved good economic benefits.
Keywords: hydropower station, generator, stator coils, rotor, insulation, economic benefits.
中图分类号:TM312文献标识码:A 文章编号:
大滩水电站装机2×1000kW,为坝后式,并网运行并起调峰作用。电站主要数据为:设计水头8.2m,最大水头10.5m,最小水头6.8m,设计流量为15.2m3/s,所选用的水轮机型号为ZT820-LH-200,发电机型号为SF1000-28/2600,定、转子绕组均为B级绝缘,发电机采用可控硅励磁。自1990年12月并网发电。
1、发电机改造的理由1)机组经近20年的运行,由于热老化、电老化、机械老化等多种因素,使发电机定子线圈很多部位绝缘出现裂纹、磨损、松脆,槽楔和端部绑扎松动等现象,严重危及机组安全运行。
2)根据电站水位变化后的水能参数和机组的实际情况,通过对原水轮机详细计算分析论证,在水轮机不变的情况下,能保证发电机容量从1000kW增容到1250kW。
3)机组增容后可增加超发峰电的能力,提高峰电比例而获得更多的经济效益。
2、发电机增容改造方案