最新文章专题视频专题问答1问答10问答100问答1000问答2000关键字专题1关键字专题50关键字专题500关键字专题1500TAG最新视频文章推荐1 推荐3 推荐5 推荐7 推荐9 推荐11 推荐13 推荐15 推荐17 推荐19 推荐21 推荐23 推荐25 推荐27 推荐29 推荐31 推荐33 推荐35 推荐37视频文章20视频文章30视频文章40视频文章50视频文章60 视频文章70视频文章80视频文章90视频文章100视频文章120视频文章140 视频2关键字专题关键字专题tag2tag3文章专题文章专题2文章索引1文章索引2文章索引3文章索引4文章索引5123456789101112131415文章专题3
当前位置: 首页 - 正文

外文文献工程管理造价

来源:动视网 责编:小OO 时间:2025-10-03 00:41:45
文档

外文文献工程管理造价

ConstructionprojectcostmanagementsystemoftheUnitedStatesofAmericaConstructionindustryisthesecondbigindustry,about8%ofU.S.grossdomesticproduct.Inthepasttwoyears,theconstructionmarketofthetotalinvestmentofupto$sixhundredbillioneveryyear,theUnitedState
推荐度:
导读ConstructionprojectcostmanagementsystemoftheUnitedStatesofAmericaConstructionindustryisthesecondbigindustry,about8%ofU.S.grossdomesticproduct.Inthepasttwoyears,theconstructionmarketofthetotalinvestmentofupto$sixhundredbillioneveryyear,theUnitedState
Construction project cost management system of the United States of America

Construction industry is the second big industry, about 8% of U.S. gross domestic product. In the past two years, the construction market of the total investment of up to $six hundred billion every year, the United States for the construction of the project is divided into the government investment and private investment projects, for government investment projects, the United States takes a whoever investment management pattern, namely, direct investment by the government department management to private management project, the government does not intervene, but the engineering technical standards, safety and social impact on the environment and social benefit by laws, regulations and technical standards to guide or limit. 

the characteristics of the construction project engineering cost management in The United States.

First, combined with the project quality and time limit for a project management cost 

Engineering management system, in the United States did not take cost and time limit for a project, quality to separate separate management, but use them as a system for comprehensive management. The idea is to: 

1. Any project must meet the quality standards under the premise of reasonably determine the construction period; 

2. As a bait engineering must have engineering quality standard, and then talk about the cost of reasonable; 

3. The project must be strictly according to plan time to perform, could not break through a predetermined cost. 

Second, the pursuit of whole life cycle cost minimum .

In the United States, after calculate the project cost, generally need to calculate the maintenance cost after the project put into operation, make the project life period cost estimates, and for the benefit of the project to conduct a comprehensive analysis, so as to avoid the one-sided pursuit of low cost, the project put into production after maintenance use costs continue to increase. 

Three, the widely application of value engineering 

American engineering cost estimation is based on value engineering, in engineering design research, generally has appraiser's participation. To ensure the functionality under the premise of as far as possible reduce the engineering cost, make the cost based on a reasonable level, so as to obtain the best investment benefit. 

Four, attaches great importance to the Work Breakdown Structure (the Work Breakdown Structure - the WBS) and accounting code 

For large and medium-sized project, in order to ensure the smooth implementation of the project, also need to Work should be completed by the decomposition, necessary to determine the cost of each unit and the implementation plan, a process known as Work Breakdown Structure of WBS (Work Breakdown Structure), and based on WBS and unified coding for accounting. Project participants in the United States has always attached great importance to the WBS and the accounting code, see it as the basis of cost plan and schedule management. 

Five, the engineering cost change and project settlement of strict control 

(a) changes to the project cost 

1. Allow the premise of change 

Generally occurs only when the following in the United States, only then carries on the project cost may change: 

The contract changes 

Project internal adjustment 

Arrange project plan 

2. The change process 

Project cost change all needs to fill in the engineering budget price change application form, and a series of documents, approved by the owner and supervisor engineer is rear executable project cost change. 

(b) the construction settlement 

1. The settlement of payment for the contractor did not exceed the budget application, entrust by owner of the architect/engineer review and approval by the owner thereof after settlement; 

2. All more than the budget more than 5% of the payment request, must pass a strict causal analysis and review. 

For construction of the project construction cost management main body and its function 

One, the government departments 

Government departments involved in the project cost management approach and action are: 

(1) local governments regularly publish all kinds of engineering cost guidelines, reference for society; 

(2) shall be responsible for the department of the government investment projects of his own head direct management and accumulation of the relevant information form their own valuation standard; 

(3) the labor standards around the department formulate and publish to directly influence the project cost; 

(4) in charge of environmental protection and fire fighting departments through the organization to develop and release relevant environmental protection standards to indirectly influence the project cost; 

(5) through a bank interest rates and other economic leverage to macroeconomic regulation and control of the whole market, which affect the components of the project cost, ultimately affect the project cost. 

Second, private owners 

Owners of private engineering distributed in all walks of life, such as cars, entertainment, banking, insurance, retail, energy production and distribution. In the United States, specialized division of labor is very fine, can't also don't have to have a owner company engaged in construction cost professionals, so the specific management of the project cost, owner is usually entrust social estimate company, engineering consultancy, etc. 

Third, architects and engineers 

Architects and engineers, also known as design professionals. In the United States, there are many architects and engineers working in the public institutions and large private institutions. But the United States also has a lot of architects, engineers, registered private independent design company, according to the contract to complete the design work, this article points to the latter. In use such as please Build (the Design - Build) project management mode, the architects and engineers and is in charge of Design and is responsible for the construction of a company to sign contract with other project management mode, the architects and engineers signed a contract with the owner. 

Four, the contractor 

Contractors are generally began in the middle and late project involved, according to owner, the initial conditions given design or construction of a facility, as the owner's intention is clear, have more solution was studied, and the choice and give up, the scope of the project and outline is quite clear. 

Contractor to very detailed, and the classification of cost apart from the above direct costs and indirect costs, for ease of construction control, also divided construction cost separately, it including direct Labour, construction equipment, as well as the indirect costs. 

The construction enterprise to manage the project cost and a group of measures is a technology management and service layer separation, employs only a small amount of technical management personnel, have no fixed workers and contract workers for a long time. According to the requirements of the construction task, at any time and sign the subcontract and all kinds of professional subcontractor in society after the completion of the task, immediate termination. 

Five, the construction manager 

Construction Manager, Construction Manager) as a whole new way of project management to Construction management, Construction the Manage - CM), was born in a new career. Construction manager is that some building construction, construction management and construction economics expert, as the agents hired by the owner, main job is in construction stage, the architect/engineer and the contractor management, supervision and coordination. In addition, the work of construction by hanging in the early stages of the project work are: 

Stage 1. decision-making stages: help determine the project goals, objectives and priority programs, developing assessment operation planning, preliminary cost estimates, preparation of the initial schedule, assist in fund-raising, assist with site selection, assist design professionals. 

Stage 2. The design phase: to provide timely cost estimating, cost control analysis of the construction feasibility of alternative design scheme primary research, to provide data on engineering material z prepare periodic progress planning, coordination and contract documentation process review, value analysis, to provide construction technical and economic aspects of the proposal, responsible for all record of the meeting. 

Stage 3. Purchasing: budgeting control, estimates published construction tender announcement, pre-trial selected bidders, the distribution of information and the bid documents, before the meeting and organize site inspection, receiving, analyzing bidding and award of bid proposal is put forward, track purchase stage and set up documents for all activities. 

The common models and methods of project management 

One, the owner management mode directly 

This way is a kind of traditional project management mode. Under this method, the owner respectively with design and construction of design agencies and contractors to sign the contract, the owner directly to supervise and control the design and construction work in construction phase, design professionals usually bear the important supervisory work. 

Two, the Design, construction mode of the Design - Building 

So-called way of design, construction, project is in principle to determine, after the owner simply select the only entity is responsible for the design and construction of the project, design, construction contractor responsible for the design and construction phase of the cost, as for the specific implementation of engineering design and construction, depending on the specific circumstances, or completed by their professionals to a subsidiary, with professional design agencies and the subcontractor or by signing the agreement by its complete, respectively. 

Three, the Construction management mode (Construction Manage - CM) 

The management mode has two kinds, the first for the construction manager is the owner of the agent, the owners to attend all the contract situation; The second for construction managers and builders. 

Agent construction management is a more traditional form, under this form of construction manager is the owner's consultants and agents, to provide construction management services. 

Construction manager and builder of the project management mode is also called risk type construction engineering management mode, in fact is the pure ground construction management mode with the combination of the traditional model, in this way, construction general contractor, construction manager and construction manager in addition to the normal contract work income, due to the guarantee of construction cost risk can get extra income. 

Construction management mode than in the past compared to other models, the main features is possible design, bidding, construction of scientific and effective full lap, which greatly shorten the construction period of the project, and can effectively reduce the cost. 

Four, the proxy type way of Project management (Project Manage - PM) 

Proxy type is not a project management project management model, but for the project selected the appropriate consulting services. In this way, the project manager is seen as a substitute for owner's a handy tool, and can according to the different ways to build (e.g., design the construction or design build) of each individual project or site to supervise the completion of the delivery. 

Proxy mode of project management is to achieve the purpose of the three big goals control, and provide to the owner by the contract management, information management and organization and coordination, etc.