Subgrade Bearing Capacity Test Report
委托单编号 Slip No.: 2015-06-001 试验记录编号 Test Record No.: 2015-06-001 试验报告编号 Test Report No.: 2015-06-001SN
委托日期Date of Assignment: 2015 年06月09日 试验日期 Testing Date: 2015 年06 月09 日 报告日期 Reporting Date: 2014 年06月11 日
EPC 承包商 EPC Contrator:: CWE 工程名称Project Title: 183MW Isimba Hydro Power Plant & Isimba –Bujagali Interconnection Project
单位工程名称Unit Work Title: 土建工程 Civil works
| 试验部位Test parts | 永久设备库柱基础Pile foundation of permanent equipment store | 委 托人Sample Delivered by | 于达YUDA |
| 试验仪器Test apparatus | 轻型触探仪 Light penetrometer | 试验日期Sampling Date | 2015.06.09 |
| 见证单位Witness Unit | 技术与质量安全环保部 TQSE | 见 证 人Witness | 邓国春DENGGUOCHUN |
| 编号NO: | 测点位置 test point | 贯入深度(m)penetrating depth | 锤击次数(N)Times | 承载力(KPa)Bearing Capacity | 设计承载力Design Bearing Capacity(KPa) | 结 论Conclusion | |||||
| 1 | / | 0.0~0.3 | 13 | 82 | ≥120 | 不合格 NO Qualified | |||||
| 2 | / | 0.0~0.3 | 15 | 98 | ≥120 | 不合格 NO Qualified | |||||
| 3 | / | 0.0~0.3 | 34 | 247 | ≥120 | 合格 Qualified | |||||
| 4 | / | 0.0~0.3 | 35 | 255 | ≥120 | 合格 Qualified | |||||
| 5 | / | 0.0~0.3 | 45 | 333 | ≥120 | 合格 Qualified | |||||
| 6 | / | 0.0~0.3 | 18 | 122 | ≥120 | 合格 Qualified | |||||
| 7 | / | 0.0~0.3 | 16 | 106 | ≥120 | 不合格 NO Qualified | |||||
| 8 | / | 0.0~0.3 | 21 | 145 | ≥120 | 合格 Qualified | |||||
| 9 | / | 0.0~0.3 | 18 | 122 | ≥120 | 合格 Qualified | |||||
| 10 | / | 0.0~0.3 | 28 | 200 | ≥120 | 合格 Qualified | |||||
| 11 | / | 0.0~0.3 | 24 | 169 | ≥120 | 合格 Qualified | |||||
| 12 | / | 0.0~0.3 | 19 | 129 | ≥120 | 合格 Qualified | |||||
| 13 | / | 0.0~0.3 | 20 | 137 | ≥120 | 合格 Qualified | |||||
| 14 | / | 0.0~0.3 | 23 | 161 | ≥120 | 合格 Qualified | |||||
| 15 | / | 0.0~0.3 | 15 | 98 | ≥120 | 不合格 NO Qualified | |||||
| 16 | / | 0.0~0.3 | 14 | 90 | ≥120 | 不合格 NO Qualified | |||||
| 17 | / | 0.0~0.3 | 13 | 82 | ≥120 | 不合格 NO Qualified | |||||
| 18 | / | 0.0~0.3 | 14 | 90 | ≥120 | 不合格 NO Qualified | |||||
| 地基平面图 Subgrade drawing | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | |||
| 1 | 10 | ||||||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||||
| 依据标准References | ||||||
| 备 注Remarks | 一、本报告局部复制无效; 二、复印件不加盖试验专用章无效。1. The copy of the report in part is invalid. 2. The copy of the report without test stamp is invalid. | |||||
检测单位Testing Unit: 中水对外乌干达伊辛巴水电站工程试验室 咨询工程师见证Witnessed by Consultant:
CWE Isimba HPP Laboratory centre
检测单位地址Address:乌干达伊辛巴水电站 签字Signature:
UGANDA ISIMBA HPP
联系电话Phone No.:0784270633 日期 Date: