一、计算参数:
1、箱梁浇段梁块体积:32.4m2, 总重:842.4KN
翼板体积: 7.36m2 重量: 191.4KN
底、腹、顶板的重量: 651.0KN
2、底模采用竹胶板加枋木(10×15cm)背楞;
内侧模板使用组合钢模板;
外侧模板使用定型钢模板;
模板的自重:0.35KN/m2。
3、施工活荷载:2.5KN/m2;
砼浇注冲击荷载:4.0KN/m2;
砼振捣冲击荷载:1.0KN/m2;
4、荷载系数取值:静载 νG=1.2 动载 νG=1.4
二、模板下枋木的计算:
1、弯曲时枋木的应力计算:
枋木间距:40cm 跨:93cm 选用:10×15cm枋木
底模面积3.0×6.5=19.5m2
651.0/19.5=33.38KN/m2
G=0.4×(33.38+0.35)=13.49KN/m
Q=0.4×(2.5+1.0+4.0)=3.0KN/m
q=νG.G+νQ+Q=20.4KN/m
q=20.4KN/m
1 2 3 4 5 6 7 8
93 93 93 93 93 93 93
650
Mmax=1/8.ql2=1/8×20.4×0.932=2.04414KN.m
W=1/6bh2=1/6×0.1×0.152=3.75×10-4m3
Бmax=Mmax/W=2.04414×106/3.75×105=5.45MPa
[Б]=12.0MPa
Бmax<[Б] 满足施工要求
2、枋木的挠度计算
E=9×103MPa=9×106KN/m2
I=1/12bh3=1/12×0.1×0.153=2.8×10-5m4
f中 =ql4/128EI=20.4×0.934/128×9×106×2.8×10-5=0.00047
f中 /L=0.47/930=1/1978
f/l=1/150
f中 /l< [f/l] 满足施工要求
三、纵梁的计算:
纵梁间距93cm 计算长度280cm 选用20×25枋木
1、枋木背楞的各支点反力计算:
NA=0.394ql=0.394×20.4×0.93=7.5KN
NB=(0.606+0.526)×20.4×0.93=21.5KN
NC=(0.474+0.5)×20.4×0.93=18.5KN
Nmax=NB=21.5KN
40 40 40 40 40 40 40
NB NB NB NB NB NB NB NB
0 1 2
l1=140 l2=140
280
2、枋木背楞传下来的集中力NB作用到纵梁上产生的内力计算:
查表:Aφ1 =1/6×21.5×[0.4×1.0×(1+1/1.4)+0.8×0.6×(1+0.6/1.4)+1.2×0.2×(1+0.2/1.4)]=5.
BΦ1=1/6×21.5×[0.4×1.0×(1+0.4/1.4)+0.8×0.6×(1+0.8/1.4)+1.2×0.2×(1+1.2/1.4)] =6.14
Aφ2=Bφ1 Bφ2=Aφ1
Rφ1=6.14+5.=12.02
M1=-3 Rφ1/2L=-3×12.02/2×1.4=-12.9KN.m
NB NB NB NB
MB
R1
40 40 40 20
36.8KN
-27.6KN
20.9KN.m
R1=MB+(1.4+1.0+0.6+0.2)+VB/1.4=58.3KN
R2=55.2KN
W=1/6×20×252=2.08×106mm2
Бmax=20.9×106/2.08×106=10.05MPa
[Б]=12.0MPa
Бmax<[Б] 满足施工要求
3.剪切应力计算
纵梁 Δs=200×250=5×104mm2
Zmax=Qmax/As=36.8×103/5×104=0.74MPa
[Z]=1.9MPa
Zmax <[Z] 满足施工要求
4.挠度的计算:
E=9×103MPa=900KN/mm2
I=1/12bh2=1/12×20×252=2.6×104cm4
跨中挠度 f中=NB/48EI×[40×(3×1402-4×402)+80×(3×1402-4×802)+20×(3×1402-4×202)
=21.5×5.9×106/48×9×2.6×106
=0.12cm
f中/L=0.12/140=1/1166<[f/L]=1/150
满足施工要求
四.主梁的计算
1.主梁受集中力的计算
单侧翼板重量 1/2×191.4=95.7KN
单侧翼板的底模板面积 3.0×4.0=12.0m2
侧模支架 每侧6片,间距80cm
荷载1.4×12.0×(2.5+1.0+4.0)+1.2×(95.7+0.35×12.0)
=245.9KN
由6片支架均担,并传递到下架下的纵梁上
纵梁选用2根Ⅰ28b为一道,每侧两道,间距120cm
245.9/6=40.98KN
P=40.98/2=20.5KN]
80 40 40 80 80 80
P P P P P P
∽ l1=140 l2=140
Bφ1=1/6×20.5×[0.4×1.0×(1+0.4/1.4)+1.2×
0.2×(1+1.2/1.4)]
=1/6×20.5×0.96=3.28
Aφ2=1/2×20.5×0.6×0.8×(1-0.8/1.4)=7.73
Rφ1=3.28+7.73=11.0
M1=-3Rφ1/2L=-3×11.0/2×1.4=11.8
40 80 20 60 80
P P P P
N0 M1 N2
N0=M1+(1.0+0.2).P/1.4=11.8+20.5×1.2/1.4=26.0KN
N1=11.8+20.5×(1.4+0.6)/1.4=37.2KN
N2=26.0KN
Nmax=N1=37.2KN
2.主梁的内力计算
Bф1=1/6×37.2×1.2×0.2×(1+1.2/1.4)=2.76
Aφ2==1/6×58.3×[0.93×2.32×(1+2.32/3.25)+1.86×1.4×(1+1.4/3.25)+2.79×0.46×(1+0.46/3.25)]=86.5
120 20 93 93 93 93 93 93 93 20 120
N1 N1 R1 R1 R1 R1 R1 R1 R1 R1 N1 N1
0 1 2 3 4
140 325 325 140
l1 l2 l3 l4
Bφ2=1/6×58.3×[0.93×2.32×(1+0.93/3.25)+1.86×1.4×
(1+1.86/3.25)+2.79×0.46×(1+2.79/3.25)]=90.4
Aφ3= Bφ2 Bφ3 = Aφ2
Aφ4= 1/6×0.2×1.2×(1+1.2/1.4)=2.76
N1=N3=6 × (2.76+86.5)=535.6
K1=2×(1.4+3.25)=9.3 a1=105.7/884.8=0.119
K2=2 ×(3.25+3.25)×12.5 a2=9.3×3.25/884.8=0.034
K3=9.3 a3=3.25×3.25/884.8=0.012
K4=9.3×12.5-3.252=105.7 a4=9.3×9.3/884.8=0.098
K5= 105.7 a5=0.034
K6= 884.8 a6=0.119
M2=0.034×535.6-0.098×1084.8+0.034×535.6=-69.9
M1=M3=-0.119×535.6+0.034×1084.8-0.012×535.6=-33.2
R1
N1 N1 M1 R1 R1 R1 R1 R1 R1
F1
F0=M1+N1×(1.4+0.2)/1.4=33.2+37.2×1.6/1.4=66.2KN
F1=M2+R1×(3.25+2.32+1.86+0.46)/3.25
=69.9+58.3×7./3.25=163.0KN
F2=33.2+58.3×(2.79+1.86+0.93)/3.25
=33.2+58.3×5.58/3.25=110.3KN
158.4KN.m 158.4KN.m
96.5KN
-96.5KN
主梁使用2[28b W=2×534.4=1068.8cm3
I=2×7481=14962cm4
A=2×60.97=121.9cm2
Бmax =158.4×106/1068.8×103=148.2MPa
[Б]=160MPa
Бmax<[Б] 满足施工要求
3.主梁的挠度计算
E=1.9×105MPa=1.9×104KN/cm2
跨中挠度: f中=R1/48EI.[(3×3252-4×932) ×93
+(3×3252-4×1862) ×186+(3×3252-4×2792)
=(26251947+33199326+1537569) ×58.3
48×1.9×104×14962
=0.26cm
f中/l=0.26/325=1/1250<(f/l)=1/150
满足施工要求
五.立杆的计算
立杆由2[40焊接成型 计算长度l=150cm
1.立杆的轴向压力计算
轴向压力 Nmax=F1=163.0KN
Ix=2×184.4cm4 Iy=2×0.6cm4
A=2×83.04cm2
ix=√2×184.4/2×83.04=14.98cm
iy=√2×0.6/2×83.04 =2.78cm
ix> iy
λy=l/iy=150/2.78=54.0
查表: =0.865
бmax=Nmax/ A=163.0×103/0.865×83.04×102=22.7MPa
轴向允许应力[б]=140MPa
бmax<[б] 满足施工要求
2.立杆的挠度计算
E=1.9×105MPa
F=FiFili/EAi=163.0×103×1500/1.9×105×83.04×102=0.15mm
立杆受压稳定,满足施工要求